|
The following is a list of work we
have completed to date
Work completed to date: March 16,
2007
Body
-
Sheet metal replacement
-
Battery box floor
-
Battery box forward wall
-
A-Brace
-
Gas tank floor
-
Front fender braces L/R
-
Front closing panels L/R
-
Fender trailing edge at door ledge L/R
-
Cowl area between hood and dash
-
Foot pedal area
-
Lower 4” of doors L/R
-
Door bottoms L/R
-
Outer longitudinals L/R
-
Inner longitudinals L
-
Jack spurs L/R
-
Floor pans
-
Rocker panels L/R
-
Rear fender braces L/R
-
4 Square Feet of misc patches
-
Misc patch repair
-
Front nose reconstructed
-
Undercoated all undercarriage
-
Body work completed - floated,
primed, and painted (Dec 2006)
Front Suspension
-
Replaced
-
Tie rods
-
Link pins
-
Wheel bearings & seals
-
Torsion bar bushings
-
Sway bar bushings
-
Steering dampener
-
Shocks
-
Rebuilt steering box
Rear Suspension
-
Replaced
-
Wheel bearings & seals
-
Torsion bar bushings
-
Axle tubes
-
Shocks
Brakes
-
Replaced all brake pads
-
Turned all rotors
-
Rebuilt all wheel cylinder
-
Replaced all hard and flex tubing
-
New master cylinder with dual circuit
-
New reservoir
Engine
-
Replaced
-
Crankshaft bearing
-
Rod bearings
-
Seals & gaskets
-
Rings
-
Exhaust
-
Rebuilt
Transmission
Electrical
Misc Other
-
New Parts
-
Fuel line
-
Accelerator cable
-
Clutch cable
-
Heater cable
-
Rebuilt Parts
|